Techno Press
Tp_Editing System.E (TES.E)
Login Search
You logged in as

gae
 
CONTENTS
Volume 6, Number 8, September25 2024
 


Abstract
The slope stabilization method is constructed on bedrock, but performance degradation occurs during an impact (earthquake, blasting, etc.) after construction, which may affect service life and factor of safety. In particular, the top-down method implies the possibility of damage caused by blasting vibration due to the construction procedure. However, the current blasting design only reflects damage to nearby facilities, so there is a limit in its ability to assess the damage of reinforcement methods caused by blasting vibration within the scope of influence. In this study, we aim to evaluate problems and damage levels caused by close blasting effects on rock-integrated structures, such as panel-type retaining walls, anchor-combined structures, and small nails, which are mainly constructed using the top-down method. We will also analyze factors affecting long-term performance according to changes in conditions after construction, such as tunnel excavation, to establish optimal design measures.

Key Words
blasting effects; cutting slope; tunnel blasting; tunnel portal

Address
Ji-Ung Lee: Department of Architectural Engineering, Chung-Ang University,
84, Heukseok-ro, Dongjak-gu, Seoul 06974, Republic of Korea
Hee Jung, Kang-Hyun Lee, SangRae Lee and Nag-Young Kim: Safety Innovation& Disaster Prevention Research Division, Korea Expressway Corporation Research Institute,
24, Dongbusunhwan-daero 17-gil, Hwaseongsi, Gyeonggi-do 18489, Republic of Korea


Techno-Press: Publishers of international journals and conference proceedings.       Copyright © 2024 Techno-Press ALL RIGHTS RESERVED.
P.O. Box 33, Yuseong, Daejeon 34186 Korea, Email: admin@techno-press.com